IIoT sensors are the cheapest line item in any predictive maintenance program and the line item with the highest hidden failure rate. A vibration sensor rated IP67 will look fine on the bench, get specified for...
Maximize production line OEE, minimize changeover downtime, and maintain audit-ready maintenance records with intelligent maintenance management designed for high-speed consumer goods manufacturing.
High-speed production line maintenance platform
Real-time line performance
SKU transition scheduling
Compliance documentation
First-pass yield tracking
Complete maintenance management tools for bottling lines, filling machines, packaging equipment, mixers, homogenizers, and processing systems operating in high-speed, multi-SKU production environments
Customizable checklists for fillers, cappers, labelers, conveyors, mixers, and CIP systems with GMP-compliant documentation and electronic signatures.
Schedule maintenance based on units produced, bottles filled, or machine cycles—not arbitrary calendar intervals that disrupt production schedules.
Coordinate maintenance with SKU changeovers to minimize line downtime. Track changeover times and optimize transition procedures for multi-product lines.
Maintain audit-ready maintenance records with digital signatures, timestamps, and complete audit trails to support FDA inspections, HACCP protocols, and food safety requirements.
Monitor Overall Equipment Effectiveness with availability, performance, and quality metrics. Track downtime causes, first-pass yield, and line efficiency in real-time.
Empower maintenance teams with mobile access designed for fast-paced production environments with QR scanning, photo capture, and real-time notifications.
MOBILE SOLUTION
Equip your operators and maintenance crews with a mobile inspection app built for high-speed consumer goods manufacturing environments:
For FMCG Maintenance Teams
Instant updates to production teams
Sanitation & calibration records
Electronic signatures & audit trails
QR/barcode for rapid identification
Make data-driven decisions with comprehensive FMCG manufacturing performance analytics:
Production Line & Equipment Insights
Availability × Performance × Quality
Root cause identification
SMED optimization insights
First-pass yield & defect tracking
Deep asset management supporting plant-to-component tracking across all FMCG manufacturing categories—food & beverage, personal care, household products, and cosmetics:
Complete Asset Management
Fillers, cappers, labelers, rinsers
Cartoners, case packers, palletizers
Mixers, homogenizers, blenders, reactors
CIP systems, checkweighers, detectors
Pre-configured inspection templates help maintain documentation for food safety audits and regulatory inspections:
Audit-Ready Documentation
Timestamped maintenance records
Verified completion records
Cleaning verification tracking
Equipment calibration history
World-class OEE is 85% for discrete manufacturing. Oxmaint helps identify availability, performance, and quality losses to move from typical 40-60% OEE toward world-class benchmarks.
Coordinate maintenance with SKU transitions using SMED principles. Reduce changeover-related downtime and maximize production time for multi-product FMCG lines.
Maintain complete maintenance records with digital signatures, timestamps, and audit trails. Historical documentation instantly accessible for FDA inspections and food safety audits.
A personal care products manufacturer with 4 bottling lines improved overall OEE from 62% to 77% within 6 months of implementing Oxmaint's production-based maintenance scheduling and real-time downtime tracking.
Up from 62% with Oxmaint implementation
SKU transition time reduced with SMED tracking
Complete documentation ready for inspectors
"Oxmaint's production-based scheduling transformed our maintenance approach. Instead of arbitrary calendar intervals, we now trigger PM based on bottles filled. Our filler nozzle replacements happen at the optimal time—reducing both premature changes and unexpected failures."
Maintenance Manager
Beverage Manufacturer - 4 high-speed bottling lines
"The auditor was impressed with our documentation. Every sanitation record, calibration log, and maintenance activity was instantly accessible. Oxmaint helped us prepare for our food safety certification audit."
Quality Assurance Director
Food Processing Facility - Multi-category FMCG production
A mid-sized frozen food manufacturer was losing $380,000 per cold chain failure event — and averaging seven compressor breakdowns per year. After integrating Oxmaint's CMMS...
A U.S. FMCG distributor running a 45-AMR warehouse fleet was treating autonomous mobile robot maintenance the same way it had treated...
Oxmaint integrates with ERP systems, IoT sensors, and accounting platforms to create a unified FMCG manufacturing ecosystem.
Explore all integrationsOxmaint supports the complete FMCG manufacturing process including bottling lines (fillers, cappers, labelers, rinsers, conveyors), packaging equipment (cartoners, case packers, shrink wrappers, palletizers), processing systems (mixers, homogenizers, blenders, emulsifiers, reactors, heat exchangers), sanitation equipment (CIP systems, pasteurizers), and quality control equipment (checkweighers, metal detectors, vision inspection systems). Our asset hierarchy supports tracking from plant level down to individual components across food & beverage, personal care, household products, and cosmetics manufacturing.
Unlike calendar-based maintenance, Oxmaint triggers maintenance tasks based on actual production metrics. For fillers, this means scheduling nozzle replacements based on bottles filled. For conveyors, maintenance triggers based on units transported. For mixers and homogenizers, PM schedules based on batch cycles completed. This approach avoids both premature maintenance (wasting resources) and unexpected failures (causing production losses and potential quality issues).
Oxmaint provides comprehensive maintenance documentation to support food safety audits. Features include electronic signatures for maintenance activities, complete audit trails with timestamps, equipment sanitation and cleaning logs, calibration records, and corrective action documentation. All records are instantly accessible for auditor requests, reducing audit preparation time significantly. Oxmaint helps you maintain the maintenance documentation portion of your food safety program—the actual compliance requirements depend on your specific facility and regulatory obligations.
Oxmaint tracks the three components of OEE (Overall Equipment Effectiveness): Availability (planned vs. actual production time, including unplanned stops and changeovers), Performance (actual vs. ideal cycle time), and Quality (good units vs. total units, including rework). Real-time dashboards show OEE by line, shift, and time period. Downtime Pareto analysis identifies top causes of availability losses, helping maintenance teams prioritize improvements to move toward the world-class benchmark of 85% OEE.
Yes, Oxmaint provides API-based integration with ERP systems (SAP, Sage, QuickBooks), MES (Manufacturing Execution Systems), IoT sensor platforms (Samsara), and production monitoring systems. This enables real-time data flow from production counters to trigger maintenance tasks, automatic synchronization of work orders with accounting for cost tracking, and unified reporting across production and maintenance operations.
Join leading consumer goods manufacturers who trust Oxmaint to maximize production line OEE, reduce changeover downtime, and ensure regulatory compliance in high-speed, multi-SKU manufacturing environments.