Every delayed meal tray, every refrigeration failure, every uninspected steam kettle in your hospital dietary department carries two risks most VPs underestimate: a Joint Commission citation and a patient harm...
Ensure patient safety, optimize medical equipment performance, and reduce costs with intelligent asset management designed specifically for hospitals, clinics, and healthcare facilities.
Complete maintenance management for medical facilities
Medical device monitoring
Automated scheduling
Digital management
Performance insights
Complete maintenance management tools designed specifically for medical equipment, life-support systems, diagnostic imaging, and critical healthcare infrastructure
Customizable checklists for life-support systems, diagnostic imaging, patient monitors, and critical care equipment.
Risk-based PM scheduling for critical medical devices, HVAC systems, and facility infrastructure.
Monitor medical device uptime, maintenance costs, and equipment reliability for patient safety.
Maintain compliance with FDA, Joint Commission, OSHA, and CMS requirements with automated documentation.
Create, assign, and track work orders with patient safety priority levels and real-time status updates.
Empower biomedical technicians with mobile access to work orders, manuals, and equipment history.
MOBILE SOLUTION
Equip your biomedical technicians and facility staff with a mobile inspection app designed for healthcare operations:
For Healthcare Biomedical Teams
Complete inspections in the field
Equipment logs & calibration records
Report malfunctions & safety concerns
Photos, asset tags & signatures
Make data-driven decisions with comprehensive healthcare facility analytics:
Medical Equipment & Facility Insights
Real-time status & schedules
Equipment reliability metrics
Biomedical equipment KPIs
Maintenance & compliance notifications
Pre-configured inspection templates ensure compliance with healthcare regulatory requirements:
Audit-Ready Documentation
Ventilators, monitors, imaging devices
Patient safety-focused work orders
FDA, Joint Commission, CMS, OSHA
Timestamps, photos, digital signatures
Automated regulatory reports
Proactive maintenance strategies reduce equipment downtime by up to 40% and improve medical device reliability.
Stay compliant with healthcare safety standards through automated documentation and inspection records.
Optimize maintenance spending by identifying failure patterns and eliminating unnecessary repairs, saving up to 30%.
A 450-bed tertiary care hospital managing 2,500 pieces of critical medical equipment reduced equipment downtime by 35% and improved operational efficiency by 40% after implementing Oxmaint's comprehensive biomedical equipment management system, saving over $1.8 million annually in maintenance costs.
Operational efficiency with Oxmaint
Annual cost reduction in maintenance spending
Critical medical equipment uptime achieved
"Oxmaint transformed our biomedical operations. The predictive maintenance reduced our critical equipment downtime by 35%, and our technicians love the mobile app. We passed our Joint Commission audit with perfect scores thanks to the automated compliance tracking."
Director of Biomedical Engineering
Tertiary Care Hospital - 450 beds, 2,500 devices
"The patient safety features are exceptional. We achieved zero equipment-related safety incidents in 18 months and passed all FDA and CMS audits perfectly. The risk-based prioritization ensures critical equipment is always operational when patients need it."
Chief Clinical Engineer
Regional Medical Center - 325 beds, 1,800 devices
Seamlessly integrate with EMR/EHR systems, medical device networks, and hospital information systems for complete visibility.
Explore all integrationsJoin leading hospitals and medical centers who trust Oxmaint to optimize their maintenance operations and ensure patient safety.